Progress of the Remodel

Well I can officially start calling this a remodel, and not just demo. The painting has begun (as was shown by Andres’ post yesterday). Armando H. has done an amazing job blasting through the painting. These photos were taken this morning. Since then the blackboard paint is already up on the south wall. WOW!

Kerry Chun (yes, the name on the plyo box) has finished framing the “ugly stuff cover” on the east wall. This will be finished out soon. Once that is done the east wall will be painted and finished. We have a major project remaining for the north wall that is pending some engineering work. We have a bunch of equipment in the truck that was recently purchased. Additionally flooring and more equipment is to be ordered in the next couple of days. The floor will be covered by 3/4″ dense rubber. These come in 4X6′ sheets and are HEAVY. We will be needing a crew to help unload and place these mats when they arrive. Depending on the timeline they will either need to just be unloaded, or unloaded into place if the timing is right. In either case a LOT of help will be needed. We will notify you of the work day. Remember 10,000lbs from ground to overhead? Well this will be 10,000lbs from truck to floor, in a far more awkward form.

We’ve been able to manage the bigger sessions in the space we have, but there are days when it is getting pretty tight. This expansion is going to yield a lot of possibilities.